vodafone village - Milan

Milani S.p.A. created the electrical and special systems for the entire Vodafone Village, a complex designed and constructed by the Dante O. Benini & Partners Architects firm. With 130 employees divided into specialised teams, coordinated by an upstream organisational structure, in addition to the electrical systems it created: the BMS supervision system for climate and lighting control; centralised emergency lighting control with zone/floor concentrators connected to the supervisor; sound diffusion made up of racks in buildings, interconnected and centralised by consoles installed in attended rooms; parking lot access control with barrier system controlled by license plate recognition video cameras, transponder; badge and variable message panels for vehicle traffic and signal LED for free spaces; fire, monoxide and compound, hydrogen and water leak detection system, made up of eleven interconnected units integrated with the supervision system and connected with the escape system; photovoltaic system for the terraced garden (80kW); 7 A category structured wiring; video intercoms and SOS columns in the underground parking lots.